Upper Elkhorn Creek

Cameron Peak Post-Fire Restoration

 

Project Overview

Upper Elkhorn Creek was determined to be a high priority site to meet CPRW water quality objectives and US Forest Service values, and this site ranked in the top five of over two dozen sites in CPRW’s prioritization. It is located within a moderate-severity burn area outside of Wilderness designation areas. Approximately 4% of the watershed was mulched in 2022. In addition, in-channel work, similar to what is proposed as part of this project, was completed in 2022 upstream of the project reach. The proposed site has been heavily influenced by not only the Cameron Peak Fire, but also current and past land uses, such as grazing and logging, that have likely led to degradation of the riparian ecosystem. Overgrazing of vegetation that burned during the Cameron Peak Fire is hindering riparian vegetation growth.

Low-tech process-based restoration techniques were used at this site. Structures were strategically placed at locations with significant incision, relic beaver dams, or riparian degradation to increase roughness, reduce flow velocities, and promote sediment deposition both behind features and on the overbank. These features will enhance nutrient uptake while increasing wetland and aquatic habitat value.

Elkhorn Creek Burn Severity: Approximately 86% of the watershed contributing to this site was burned during the Cameron Peak Fire. The JW Associates Hazard Assessment concluded that the entire Black Hollow watershed as “highest” hazard. (Courtesy of Ayers Associates)

Elkhorn Creek Post-Fire Mitigation Plan: Proposed features were strategically placed at locations with significant incision, relic beaver dams, or riparian degradation to increase roughness, reduce flow velocities, and promote sediment deposition both behind features and on the overbank. These features will enhance nutrient uptake while increasing wetland and aquatic habitat value. (Courtesy of Ayers Associates)

Post-Fire Treatment(s)

Log Structures – Burnt trees were felled, placed, and interlocked in the channel to increase roughness, reduce flow velocity, and enhance sediment deposition. These features will limit flow velocities and shear stress that result in erosion. Log structures will also return flow to the overbank areas, reducing incision and rehabilitating the floodplain area. On-site burnt material were primarily used. These features were field fit by the design team and placed to encourage sediment deposition. Placement will utilize the relic beaver dams, where feasible, to reintroduce water areas behind the dams and promote riparian vegetation growth.

Post Assisted Log Structure (PALS) – On-site woody material of various sizes was pinned together with untreated posts driven into the streambed to initiate and simulate natural wood accumulation. PALS provide opportunities for sediment storage behind the structures while promoting floodplain connectivity, additional wood recruitment, and riparian health. These features were field fit by the design team and placed to encourage sediment deposition. Placement utilized the relic beaver dams, where feasible, to reintroduce water areas behind the dams and promote riparian vegetation growth.

Riparian Revegetation - Recovery of riparian ecosystems is vital to improving water quality. Establishing woody riparian vegetation, primarily willows, increases the capacity for sediment storage, nutrient uptake, and habitat complexity in riparian and aquatic ecosystems. These willows are incorporated into the log structures and PALS to provide additional support.

Willow Wattle – Willow stakes are harvested off-site and bundled using biodegradable twine. These bundles are then partially buried and staked into areas with regular baseflow where willows would naturally grow. Willow wattles provide water quality improvements through rapidly establishing woody riparian vegetation to increase sediment storage and nutrient uptake.


Project Goals

  • Improve water quality and ecological functioning by providing opportunities for sediment storage, nutrient uptake, and enhanced aquatic and riparian habitats.

  • Improve stream processes in Elkhorn Creek that align with downstream Wild and Scenic recreation, aesthetic, fisheries, and aquatic habitat values in the Cache la Poudre River.

  • Use process-based restoration techniques to meet the project objectives.

Project Collaborators

  • U.S. Forest Service

  • Ayres Associates

  • Wildlands Restoration Volunteers

  • Alpine Eco

Funder(s)

  • Colorado Department of Public Health and Environment (CDPHE)

Project Timeline

Completed - 2022; Monitoring ongoing